on 03-07-2019 3:19 PM
Our BPC package scheduler doesn't run package-link intermittently. For example, we define a new package schedule for a package-link on a weekly basis, it runs perfectly. after a couple run, we go in the schedule (edit schedule) for that package-link and modify some prompts and save it. Then the next schedule run will not run at all. Even if it show "shedule" with the correct date in package-scheduler-status. Can someone saw this before ?
We are on BPC 10 NW 7.31
EPM 29-2
Same issue here. It is very buggy!
A package link & prompts that were set and scheduled by one user, which another user 'verifies' those prompts and schedule without saving anything, appears to already prevent the package link from running.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I have the same problem.
We try disabling the schedule, making changes, and then re-enable.. sometimes the change takes effect in the next run, and sometimes it doesn't.
I've noticed this especially when the schedule was created by one user and then modified by another user.. not sure if there is a connection.
The link between the EPM scheduler and the schedule In the BW back-end seems to be flawed.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
1. Stop schedule
2. Modify prompts
3. Save package link
4. Schedule again
🙂
P.S. The behavior of scheduled package link is not clearly defined after edit. For example, read note: https://launchpad.support.sap.com/#/notes/0002173574
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
6 | |
5 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.