cancel
Showing results for 
Search instead for 
Did you mean: 

BPC package scheduler doesn't run package-link intermittently

patrice_chartier
Explorer
0 Kudos

Our BPC package scheduler doesn't run package-link intermittently. For example, we define a new package schedule for a package-link on a weekly basis, it runs perfectly. after a couple run, we go in the schedule (edit schedule) for that package-link and modify some prompts and save it. Then the next schedule run will not run at all. Even if it show "shedule" with the correct date in package-scheduler-status. Can someone saw this before ?

We are on BPC 10 NW 7.31

EPM 29-2

Accepted Solutions (0)

Answers (3)

Answers (3)

JefB
Active Contributor
0 Kudos

Same issue here. It is very buggy!

A package link & prompts that were set and scheduled by one user, which another user 'verifies' those prompts and schedule without saving anything, appears to already prevent the package link from running.

former_member186338
Active Contributor
0 Kudos

Sorry, but without BPC/BW/EPM version/SP this info is useless.

0 Kudos

I have the same problem.

We try disabling the schedule, making changes, and then re-enable.. sometimes the change takes effect in the next run, and sometimes it doesn't.

I've noticed this especially when the schedule was created by one user and then modified by another user.. not sure if there is a connection.

The link between the EPM scheduler and the schedule In the BW back-end seems to be flawed.

former_member186338
Active Contributor
0 Kudos

1. Stop schedule

2. Modify prompts

3. Save package link

4. Schedule again

🙂

P.S. The behavior of scheduled package link is not clearly defined after edit. For example, read note: https://launchpad.support.sap.com/#/notes/0002173574

patrice_chartier
Explorer
0 Kudos

this note talk about -->After Upgrading to BPC10.1 from BPC 10.... but we are already on BPC 10.

patrice_chartier
Explorer
0 Kudos

do you if there are BW tables where I can validate that my BPC schedule is setup correctly, instead of waiting to see if the scheduled package run or not ? thanks

former_member186338
Active Contributor
0 Kudos

What is your BPC SP?

patrice_chartier
Explorer
0 Kudos

Hi Vadim,

we are on :

BW Netweaver 7.31 SP24

HANA 1.22

CPMBPC801 SP19

EPM SP29-2

.

thanks

former_member186338
Active Contributor
0 Kudos

On

BW Netweaver 7.31 SP24 ? And with HANA?

Why not to upgrade, may be the issue will be solved...