How can I run cost estimate considering another Exchange Rate Type instead of M, I have create a new Exchange Rate Type P I have define the new ratio and i gave the rate. now i want to run the cost calculation and see the value with new rate. My issue is to have a cost estimate saved and not released on different version in wich there is an exchange rate type equal P so different then M.
thanks