Skip to Content
avatar image
Former Member

LLC before heuristics

Hi Experts,

I have a very basic question.

Can I ever run heuristics without running LLC before heuristics? I know system will not restrict me, but will the planning results be correct?

Regards

Manotosh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Nov 04, 2010 at 07:26 AM

    Hi

    I will suggest to execute the LLC determination in case of you have modeled BOM or executing multilevel heuristic as this information is required to determine the correct planning sequence for the location products, to ensure the demands get fulfilled correctly.

    Please find the detail information below for you.

    http://help.sap.com/saphelp_scm41/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htm

    Thanks

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Nov 04, 2010 at 07:27 AM

    Hi,

    The LLC specifies the bill of material (BOM) level and supply chain location at which a location product is situated. The heuristic needs this information to determine the correct planning sequence for the location products, thus ensuring that demands are fulfilled correctly.

    Always execute this function before an SNP heuristic run if changes have been made to PPM or T- Lane that are relevant to low-level code determination and thus for the SNP heuristic planning sequence.

    Thanks,

    nandha

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thank you to all who replied.

      yes I am using BOM and was concerned because of that.

      Regards

      Manotosh