on 10-29-2010 12:33 PM
I have a finished product that has a base unit of measure M2.
In the BoM and Recipe the header UoM is M2
When I create a Process Order the UoM (the confirmation UoM is changed to M), even though this is not maintained in the Alt units of measures.
When I check the confirmation with Tcode CORT it is displaying the yield in M and not M2
Is there anything apart from the above that could effect this.
Thanks in advance,
There was a technical issue where the confirmation screen UoM was not overwriting the main table used in confirmation reporting
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check are you maintained production unit as M in Work scheduling view. & also check the UOM in Master recipe c202, whether you are maintained as M. If yes change it to M2
Edited by: Sundaresan . E. V on Oct 29, 2010 5:27 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
So after digging a little deeper into the recipe, I have found that tha activity units of measure are maintianed in M.
If I check the operation standard values I can see that Charge Qty is in M2 and the Operation Qty is in M (so a conversion between the 2 UoM's exists)
Does this override the M2 UoM (In material master, Bom, Recipe header, process order and Confirmation screen) with respect to reporting in CORT?
So what I am trying to achieve is as follows:
The material master, bom, recipe and process orders are created in M2
The confirmation is in M2 (the profile has not had a defualt UoM assigned)
The confirmation operation is set to Operation UoM M (currently set at the moment) in one client all confirmations are being reported in M2 and in another client as M - this is where I am struggling to identify the difference
Confirmation information against the Process Order to be M2
Logic would tell me that the Operation UoM should be M2 to then record the qty based on this but as mentioned above it is working as required even if the operation is set to M,
Thanks in advance,
Edited by: Guy Hall on Nov 1, 2010 3:17 PM