Pricing conditions from SRM PO to ECC PO

Hi,

We are working with SRM 7.0 with PPS.

We are creating PO's in SRM with relevant conditions for the (Delivery conditions). The se conditions are manully created in SRM which are maintained in ECC.

When i am creating the PO with the conditions, In ECC PO it creates with only condition i.e, PBXX.

But my requirement when i am replicating the PO to ECC from SRM, the PO should replicate with all the conditions similar to the PO which is created in ECC.

Can any one guide me how this can be done.

Regards

Sunil

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 30, 2010 at 01:42 PM

    Hi,

    Isn't ECC pricing applied for all ECC documents. Thus pricing for replicated documents from SRM is also re-determined in ECC via ECC pricing? I thought it would work like that?

    Kind regards,

    Tim

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      If you are created PO in SRM in ECS scenario with the condition types, when it is replicated to backened system in ECC PO it will take only one basic price condition i.e., PBXX with the final price(inclusive of discounts, surcharges etc. which are maintaned has conditions in SRM)

      Sunil

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.