I was given a task where the apporiate spot to place a SFC on hold would be inside the NC router, but the point of where the hold is wanting to be placed is inside the Production router. SAP ME doesn't allow to place a future hold on a SFC if the operation is not present in the current router.
So I figure out that my hold will have to be placed into the Production router, by custom scripting. I was wondering if there was a way to Close a NC or call out a specific NC code through a router path by using a custom script. I would like to have the NC closed but don't really see an option with this.
P.S. I only want the hold to happen on certain circumstance, control run for an example.