Possible to link prod version of top level mat with prod vers of component?

54 Views

Material A has a BOM that has 2 production versions, Version 1 and Version 2 (2 different production lines).

The BOM contains semi-finished material B. B also 2 production, Version 11 and Version 12 (2 different production lines also).

When for planning/costing Version 1 is used, it should always pull in Version 11 of the component BOM.

If Version 2 is used, it should always pull in Version 12 of the component BOM.

Any idea how we can control this? I canu2019t see where to link in the lower level production version.

Thanks a million