Skip to Content
author's profile photo Former Member
Former Member

How to adjust jco connection life team for CE 7.2

Hello,

I know from NW 7.0 that the connection life time can be adjusted in Visual Admin. As there isn't this tool anymore in CE 7.2 I'd like to know where this parameter can be set.

For my understanding connection life time is the time until the jco is closed if it's not used anymore.

Any idea?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 28, 2010 at 09:14 AM

    Problem solved: see here: [here|http://help.sap.com/saphelp_nwce72/helpdata/en/4a/5d28bcf2cb351ce10000000a42189b/frameset.htm]

    Edited by: Stefan Walter on Oct 28, 2010 11:14 AM

    Edited by: Stefan Walter on Oct 28, 2010 11:15 AM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.