Skip to Content
author's profile photo Former Member
Former Member

To pull the Freight value from the PO into the billing document

Hi Experts,

I have a requirement to pull the Freight charges from the PO into the pricing condition of the billing document.

Kindly let me know the ways how i can achieve the above problem.

Thanks & regards,

Murali

Moderator message: please (re)search yourself for existings answers first.

Edited by: Thomas Zloch on Oct 27, 2010 6:27 PM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Oct 27, 2010 at 03:01 PM

    Easily done, but simply posting a requirement here does not get you an answer. You have to demonstrate some knowledge or effort on your part first. What have you tried?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.