Dear All,
I have created -MOULD DIE as a PRT tool in CF01.(I dont want to create the Mould die as a Material it can only be a PRT tool)
I need to issue the Mould whenever it is required to production.
I need to have track on the PRT issued to production.
I need to issue the PRT from its storage location whenever the production requires it & track.
Keep in mind I need this Mould only as PRT TOOL (CF01).
Is this can be done ,Pls suggest a better solution.
Point will be awarded
Subbu.