on 10-25-2010 5:12 PM
Hi,
When I want to release a production order, it does not let me release it because of a SAPAPO/ATP error (E:/SAPAPO/ATP: 035 011 PP).
What can it be?
Thank you!
Hi
Please check
1. The Integration Model for ATP check is active
2. Material relevant for APO
3. Check Mode & Business Event for the material is maintained
4. ATP check for Production order is configured
Sridhar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
During the production order release material availability check is carried out automatically.This can be done in ECC by defining
Checking group, Checking rule, Checking Scope and Checking Control in the Shop floor control parameters in SPRO.
Request you to check in the checking control defined for the Order type and Plant for the Business function 2( Check availabilty during order release) under Material availabilty for Release material " No release if there are missing parts " is defined.
With this setting if there is any material shortage for the components then Prodn order will not get released.
Thanks,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.