Dear All
I have created Project through Sales Order. Delivery date in sales order is end date of project
All activities are link (established relationship) one network and assigned to WBSEs in project.
I have also mentioned the normal duration for each activity in network.
I am doing scheduling of these activities with following specific requirements -
1) Backward scheduling is to be done...start date for network can be either today's date or it can also be in the past...end date for completion of network is fix.
2) Scheduling is to be done on entire project, the dates should be determined by the system for activities and should be transfered to the respective WBS elements (i.e. network determined dates)
I have maintained following config settings -
Scheduling Parameters -
Adjust date - 2 (do not adjust)
Scheduling type - 2 (Backward)
Automatic scheduling - Ticked
Reduction strategies - All opern in the order
Parameters of Scheduling -
Backward, network det date, adjust basic dates (tick), Automatic scheduling (Tick)
when I run scheduling for entire project its gives result properly but in report CNS41 my dates for ErlStrt(B) F and LtStrt (B) for WBS seen ##.##.#### .
Do I need to change anything in the config???
Regards
Try with CN41 / CN41N and then check the dates.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ahemad
The issue was same with all reports. The date was display properly in WBS under dates tab or even I able to view report from CJ20N through Project Planning board (gantt chart) by selection of dates field. I only get problem under to column ie ErlStrt(B) and LtStrt (B) where dates was reflected ##.##.#### only for WBS but activities under same WBS dates shown properly.
Regards
Hi
Did you check the dates in project planning board? I believe the field lenght is not suitable to display in your case (generally ##.##.#### means improper display). Also try to check scheduled dates after scheduling (hope you used shift dates after any improper scheduling results..if not try once).