Engg bom and mfg bom

DEAR ALL

Pl explain the engg bom and mfg bom insap for to crate and also convert from enng bom to mfg bom

what are the configuration requried .pl explain indetailsand also provid

thans and regrads

Baswaraj

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Posted on Oct 25, 2010 at 09:40 AM

    Hi

    While creating the BOM you need to define th BOM usage which defines the area (such as engineering/design or production or sales or costing) where a BOM can be used.

    with usage 1 it is for manufacturing

    with usage 2 it is for engg/design

    If you us BOM usage 3, universal it can be used for manufacturing and engg /desig

    Regards

    Anupam Sharma

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 25, 2010 at 09:45 AM

    Engineering BOM

    Engineering BOM is used for design Purpose, You need to create a BOM with Usage 2

    Mfring BOM:

    This used for creating a Production order and relevant for MRP, You need to create a BOM with usage 1

    you can convert the engineering BOM to Material BOM by using Copy as from engineering BOM to Production BOM in Cs01

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 25, 2010 at 10:03 AM

    Dear

    You can create Engineering BOM with Usage-2 IN cs01 and Production BOM with usage as 1 in CS01.Frsom the name itself , Engineering BOM is used in Details Engineering /lay out desing -Engineering purpose before actual fabrication job starts.Where as if you know the production structure based on the materials required and want to manifatuire in in house , then BOM for FG item will be MFG BOM .

    But you cana lso create BOM with usage -3 for both the purpose in one time and this can also be used other puoise like Sales , Costing , PM etc.

    How to convert Engineering BOM to MFG : Goto CS01-BOM Usage as 1(prd ) -Hit Copy from -Provide Engineering BOM here and select the item

    Check this and come back

    Regards

    JH

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear Go to T code CS01enter the material and Usage 1 as you are creating the production BOM from engineering BOM now click

      on copy from icon or press F7 you will get alternative 2 added again enter give usage as 2 as you are copying from engineering

      BOM and press enter and create the BOM as per your requirement.

      Now you can able to create 2 alternative BOMs for same material with different usage purpose.

      Hope it is clear to you.

      Cheers

      KK

  • Posted on Oct 25, 2010 at 10:03 AM

    Dear,

    No special config is required as suggested by the forum member you do this by BOM usage for an Engineering BOM (usage) and Production BOM (usage 1).

    Form BOM top MenuEditextend to copy if you ant form one usage to another.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 25, 2010 at 11:18 AM

    Dear Raj,

    Check this link

    engineering-bom-to-production-bom

    Regards

    S Mangalraj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.