Dear Experts,

Client system is already having some materials.From these 100 materials ,we would block the 99 materials and the rest material(say X) will be managed in batches.To do this I have thought in the following way:

1.Posting stock to the the material X through material to material transfer.

2.Activate deletion flag to the 99 materials and change the deletion flag message type to Error message from the warning.

3.Blocking the transaction of these materials for two to three hours.

4.Create a new material and manage it with batch with classification.(say Y)

5.Material to material stock tranfer from X to Y.

6.Change the BOMs where these 99 materials were used.

7.Material assignment to routing operation does not require change as components were assigned to operation through default first operation,which will be managed by the system itself when I change the BOM.

Anything more I require to plan..Pl advice

Regards

Reshmi

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Oct 25, 2010 at 07:55 AM

    Dear,

    What is your requirement? What you want to do?

    Please elaborate your requirement

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.