Skip to Content
0
Former Member
Oct 21, 2010 at 09:17 AM

Revision Level

90 Views

Dear support,

i create a new revision Level in the material master , bom , and routing for the FERT material.

Are there this field in the sale order ? and in the batch information?

I need create a sale order for the revision level A , but in the material master there is the revision level B .

Is possible?

Thanks a lot

Daniele Pistilli

PP TEAM