Dear support,
i create a new revision Level in the material master , bom , and routing for the FERT material.
Are there this field in the sale order ? and in the batch information?
I need create a sale order for the revision level A , but in the material master there is the revision level B .
Is possible?
Thanks a lot
Daniele Pistilli
PP TEAM