Hi,

Is it possible to run MRP without considering unrestricted stock of the material?

Best Regards,

Sitaraman

Add a comment
10|10000 characters needed characters exceeded

Related questions

8 Answers

  • Best Answer
    Posted on Oct 21, 2010 at 06:24 AM

    Dear,

    Strategy 11 will not work in you case becuse for the Low level BOM item system will consider the Unrestricted stock. Yes you can exclude the stock as per the storage location SPROProduction>MRP>planning>Define Storage Location MRP per Plant

    for a given plant and storage loc combination set the MRP indicator as 1.Maintain the material with this storage loc and in MRP 4 make storage loc indicator as 1.

    I am not sure about this please try with OPPQ and their for your plant maintain available stock for Unrestricted,Blocked and Stock in transfer. Please remove the tick and try it.

    Else you can do this with the BADI 'MD_CHANGE_MRP_DATA' in this use method CHANGE_MDPSX to exclued the Unrestricted stock from MRP run. Please check with your technical consultant.

    Hope it will help you.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 20, 2010 at 10:18 PM

    You can , for instance , exclude the Storage Location where the product is stored from MRP. You find this in Customizing

    Production >> MRP >> Planning >> Define Storage Location MRP per Plant and select the indicator "1".

    Or alternatively, if the product have some strategy (MRP3), you can select "11" , to run Gross requirement Planning.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2010 at 02:06 AM

    Dear Sitaram,

    Yes

    You can Go with strategy - 11 ( Gross requirements planning )

    This strategy will not consider the stocks in MRP.

    If you want this only for one time then

    Move the stock to one particular storage location and in t-code OMIR mainatin value as 1 for that storage location

    Then system will not consider the stock of that particular storage location

    Regards

    Madhu

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2010 at 02:49 AM

    Hi Sitaram,

    If system dont want to consider the unrestricted stock for regular MRP means please assign the planning strategy 11 ( Gross Requirement Planning) if it is not you can exclude from MRP in the combination of material and storage location in T code MMSC or otherwise in MRP 4 view in material master.

    Check and Revert

    Thanks

    P.Srinivasan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2010 at 05:07 AM

    use MMSC, and check which Storage location need to be excluded from MRP, and then put "1" in the indicator.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 21, 2010 at 05:46 AM

    Hai,

    Use strategy group 11 in the MRP 3 view for this material ( gross requirement planning ) and do the MRP run again

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 21, 2010 at 05:57 AM

    Dear ,

    Are you considering only Unrestricted stock not to consider for MRP run ??

    To address this issue you need to do the following

    1.Assing Planning Startegy 11 in MRP3 view with Mixed MRP Indicator -2 .

    2.If you do not want to consider Unrestricted , then you can move it this to a special Interim storage location and keep Storage Location MRP indicator as 1-Exclude from MRP or keep the same in OMIR as 1.

    Hope this helps

    Regads

    JH

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 26, 2010 at 11:45 AM

    Dear All,

    Thanks a lot for your response to this thread.

    In fact i tried the option of providing value 1 to exclude the storage location stock from the MRP. But it did not fulfil my requirement.

    My requirement is as below:

    The business wants to create the material requirement by manual reservations.

    Also for this MRP run except this manual reservations all other issue elements, receipt elements and stocks should not get considered.

    With checking group configuration i am able to exclude all other issue, receipt and stock elements. But in this settings there is no option to exclude the unrestricted stock.

    What happened when i tried giving 1 in MRP 4 view to exclude the storage location stock, the system not only excludes the stock but also it excludes the storage location from MRP run. Meaning...

    Plant XXXX

    SLOC YYYY

    SLOC - YYYY current stock: 100

    Manual reservation created (requirement) for SLOC -YYYY : 50

    The expectation out of MRP run is, to create procurement proposals for 50 numbers with out considering SLOC - YYYY stock of 100 and not to exclude the SLOC YYYY itself.

    Best Regards,

    Sitaraman

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.