Inspection rounds with PM integration QM

Hi gurus,

We need to design a plan for one area of the company that matches the needs for inspection round:

● Planned on a regular basis for each shift.

● The inspection round is always completed within one day, or within one shift.

● The duration of the inspection round includes the work and the round itself within one plant.

One of the principal needs is also being able to asign measuring points to particular task lists.

We tried using the option creating our equipments as PRT and assigning it task list in PM but not sure this is the best way.

Any idea? integration PM-QM? the thing is that in QM TX-QP01...inspection plans...use materials instead of Equipments.

Thanks,

VL

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 20, 2010 at 10:00 PM

    VL,

    I am not sure about the need to integrate QM with inspection rounds.However have you looked at the "Inspection Round" Functionality avaalable from [EHP4|http://help.sap.com/erp2005_ehp_04/helpdata/en/42/fbded750e61febe10000000a422035/frameset.htm]? It looks like it might just solve your problem.

    If you are in lower version, another way is to to accomplsih this is by following the below steps

    1) create a Measurement point list to identify all the measurement points to be captured in each inspection

    2) creating a separate Maintenance plan for this activity that would generate a Notification object on a daily basis.

    3) Enhancing the Maintenance plan using user exit ( IPRM0003 User fields: Maintenance plan) to assign the above mentioned Measurement point list to the maintenance plan.

    4) Assign the Measuremnt point list to the notification on create of the notification so that the measuremnet docuemnts could be recorded.

    Hope it helps.

    Regards

    Narasimhan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2010 at 08:25 PM

    Hi Narasimhan,

    Could you please specify around last point (#4)

    Assign the Measuremnt point list to the notification on create of the notification so that the measuremnet docuemnts could be recorded.

    how do we assign that list upon notification creation? i don't see it in standard IW21, shall it come with activation of IPRM0003 or something else should be coded to enable it? Are we adding some extra screens for notification type in spro? I didn't see any relevant screen area except reference docs-inspection lot..

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Sergey,

      The functionality in EHP4 is more detailed.It provides the opportunity to plan more accurately and capture cost and additional information as part of it.Also this s standard No enhancements are requirement to accomplish it.

      I thought the first object that you had assigned to the operation would show up on the general screen at the operation level.

      Regards

      Narasimhan

      P.S: Please create new queries for new questions.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.