Hello,

I have a scenario wherein I would like to assign different valuation variants per plant.

However the system is not allowing me to assign a different valuation variant at the plant level than what is present at the main screen.It throws out the following error when I try to assign a different valuation variant at the plant level.

Specify the key within the work area

Message no. SV033

Diagnosis

You have attempted to create an entry whose key is not in the range defined for this area.

System Response

The entry cannot be created.

Procedure

Please check your entry.

Would appreciate if anybody could show me a way to assign different valuation variants based on plant.

Thanks,

Krish