on 10-14-2010 4:14 PM
Hi all,
Pl let me know what's the best way to bring DP forecast into ECC. Should I publish it from SNP, or transfer from DP. I look for similar result in MD04 and Product View.
Thanks
Vardev
thanks all
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Yes with /SAPAPO/MC8U - Maintain Transfer Profiles you can create the Transfer profile which will be used to release the FCST in ECC system as planned ind. Requirement . Detail information is below for your reference.
http://help.sap.com/saphelp_scm41/helpdata//EN/c9/b4df8b70c011d398450000e8a49608/frameset.htm
If you are using respective strategy 40 i.e. planning with final assembly it will consume the FCST by sales order. The unconsumed FCST will still be present in MD04 as planned ind. Requirement.
So at the end , you will have 2 demand element sales order and unconsumed FCST as form of planned ind. Requirement.
Thanks
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Vardev
As Amol has mentioned , the standard procedure is to release the forecast from DP to R/3 and if you use SNP from DP to SNP
Thanks
Aparna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
You can directly transfer the FCST from DP with the help of release profile (/SAPAPO/MC8S - Maintain Release Profiles) to ECC system. Please refer the below link for more information.
http://help.sap.com/saphelp_scm41/helpdata//EN/0d/429bd538ee11d3982b0000e8a49608/frameset.htm
The FCST will be released to ECC as planned ind. Requirement which will be form of demand. When you execute the MRP or MPS , it will create supply element for these Demand elements.
Thanks
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I think this will release into SNP/PPDS and not to ECC.
You may have got confused with transfer profile. With transfer, it will result in original forecast and not the consumed forecast into ECC. I am not sure if strategy 40 in ECC allows/does consumption.
Appreciate everyone inputs. And looking forward to more..
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.