Mapping of Period of adjustment in R/3 with APO

Hi all,

We have maitained period of adjustment for PIR's in R/3 as 7 days into past ie., PIR's older than 7 days in the past will not be planned in R/3.

Now we gone for APO-DP. How and Where to maintain the same settings so that system doesn't consider PIR's older than 7 days during production planning run.

Thanks in advance

Durai

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2010 at 10:04 AM

    hI,

    Check in /SAPAPO/MAT1 under SNP 2 tab page under SNP Demand profile Forecast Horizon.

    Also ForecastHorizon ind in Past

    Thanks,

    nandha

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2010 at 10:45 AM

    Hi

    I am little bit confused currently as you are talking about APO-DP and also the same time PIRs consideration during production planning run. In APO-DP we only do FCST.

    If you are talking about APO-SNP than the above information provided my Nandha is useful for you.

    Thanks

    Amol

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.