Skip to Content

Set Lock Indicator for Activity Type

Hello Guru's,

In My Current project, There had been a numerous transactions happened with few Specific Activity Types, I wanted to know what may happen if i lock the activity types.

Regards,

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 13, 2010 at 01:44 PM

    HI,

    if you set the lock indicator in activity type master check F1-help for the field, its only affecting planning activities:

    Lock Indicator

    Indicator determining whether an activity type is locked for activit

    input planning.

    If the indicator is active, the affected activity type cannot be

    included.

    Notes

    If planning is reconciled, meaning plan activity = scheduled activit

    the indicator should be activated so that the plan quantity remains

    unchanged.

    If the indicator is inactive, the activity type can be drawn upon fo

    activity input planning and indirect activity allocation in plan.

    If active, the lock indicator has no effect on

    o actual postings

    o planning, other than activity input planning and indirect activity

    allocation in plan

    o activity price changes

    Best regards, Christian

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.