Skip to Content
author's profile photo Former Member
Former Member

Batch determination realtionship Availability check

Hi Experts,

Can anyone explain about the how Availability check effects the Batch determiantion. If possible please provide me a document which explains the relationhips between both these functionalities with respect to PP.

We have a issue with regarding the Batch determiantion

Thanks in advance.

Nagesh G

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Oct 13, 2010 at 07:31 AM

    Dear

    Batch determination and availablity check are two different aspect.Basically , Availablity check (OPJJ) will be at material master level and configured NOT as plant specific .Availablity check can be performed for Production Order avaulablity check ( depends of OPJK configuration with order type and plant to automate system to perform ATP) as well as Sales Order fulfillment -SD avilablity check to confirm the delivery .

    Where as batch determination which is interlinked through Batch search stategry ( either as order type level ) with condition type (COB1) aginst movement type /plant /order type combination .

    Do you mean to say wether any availabity check happens during batch Determination ??

    It would be bettre if you re-frame your actual requirement ??

    Regards

    JH

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      The availability check is always performed when you do the batch determination. It is the standard routine inside SAP.

      When you click batch determination, the ATP is performed automatically. It will use the checking rule per your transactions. For example,

      - if you click batch determination in production order, the availability checking rule per your order type (setting in config of production order avail check) is used.

      - If you click batch determination in sales order, the checking rule A is used (hard code by SAP).

      - If you click batch determination in delivery, the checking rule B is used (hard code by SAP).

      - If you click batch determination in MM, and the avail.check rule in movement type or transaction code are set then that will be used. Otherwise only unrestricted used will be available.

      Hope it helps.

  • author's profile photo Former Member
    Former Member
    Posted on Oct 13, 2010 at 07:09 AM

    Dear Nagesh,

    Batch determination is used to determine available batches based on selection criteria maintained in class characteristics. System will list out all batches according to selected characteristics values in classification.

    Can you explain what problem you are facing in detail.

    Regards,

    Pavan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.