I cant able to create Subcontracting PO - Its throws an error Not possible to determine any components

The BOM is not exploding - If i map the component manually its working fine.

For your reference :

  • I have created BOM and checked the usage ( 1 -Production )+ status is active

  • Checked the dates - current date to 31.12.9999

  • CS03 - item view - Explosion type is blank

Guide me to solve this issue .

Regards

Anand

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 13, 2010 at 10:46 AM

    Please check the following things :

    1. In Material master MRP4 view - Field "Individual/Coll" should have value "2" or "Blank" & In BOM (Transaction code CS03) item detail section - Field "Explosion Type" should have value "LB" ("Individual/Coll" should have value "2" or "Blank") .

    2. PIR should have PIR Info category "3" , i.e., Subcontracting PIR must available for header material which we receive back from subcontractor.

    3. Special Procurement Key must be "30" in material master MRP2 View.

    4. Purchasing Item Category must be "L" and production BOM must be maintained, if you want to explode BOM in PO.

    5. Please check BOM valid period is effective from in Tcode cs03

    6. Please check your PO date against the valid date of the BOM valid period.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 13, 2010 at 11:21 AM

    Please search with subject "Not possible to determine any components",you may find answers for error.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2010 at 06:30 AM

    Please review the following SAP Notes:

    SAP Note No. 13023

    For BOM selection using the the production version, note 39032

    should be observed if the production version is created by a

    customer report instead of using SAP standard methods.

    SAP Note No. 39032

    Check whether the production versions in table MKAL are correct:

    Call transaction SE16 for table MKAL.

    Select the production version to be checked.

    Field MKAL-STLAL (alternative BOM) may not contain any one-digit numeri

    entries, such as '1 ' or ' 1'.

    These entries must be created with leading zeros in the database, for

    example, '01'.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.