on 10-13-2010 4:24 AM
Hi SDN,
I would just like to ask if it is possible to enter additive costs to a material via CK74N for multiple Cost Elements using the same costing date from / to and valuation date? Currently, whenever I enter costs for different Cost Elements but same material and identical costing dates, the system overwrites the other costs that are entered. Meaning, only the last cost posted is honored, even if they belong to different Cost Elements.
Is there a way we can set up the system where the posting belongs to the same costing dates but belong to different cost elements, it would still display the additive costs per Cost Element?
Thanks and advance and pardon my ignorance on this matter, for I am not really that well versed in Costing.
No replies yet? Anyone with the slightest idea on what to do? Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Anybody have an idea on this? Thanks in advance
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.