Skip to Content
author's profile photo Former Member
Former Member

Producion reaciving

Dear Eksperts

What wolud be your advices in such a scenario?

Before start of a producion in producion palnts we have to do put away strategy based on producion order witch determinates where the product will be stored. But I have a producion of aseptic produckt from witch first 3 palets have to be separated to Quarantine ( and phisicaly seperated form rest of products form the same producion) according to put away strategy system will generate WP conected with putting those palets to bins witch were selected in put away startegy. Product on quarantine is in diferent SL.

Do I have to put away those 3 palets against information generated by the system to diferent place and manualy move quantities for QI to another SL or is better option?

All coment will be helpful.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Oct 12, 2010 at 03:31 PM

    Hi

    I am not sure that I understand your isse but when you create the put away strategies there should be on for statis 'S' one for Q'Q' and one for unrestricted

    If these are maintained the the 3 pallets on Q'Q' should follow one strategy whilst the rest of the pallets that are unrestricted will be put away according to the strategy for unrestricted

    For instance if you have the following strategy

    Warehouse XXX Op E Indicator XXX Stock Category 'Q' St Type search 001 002 003

    Warehouse XXX Op E Indicator XXX Stock Category St Type search 004 005 006

    Warehouse XXX Op E Indicator XXX Stock Category 'S' St Type search 007 008 009

    The 'Q' stock should go to 001 and then if no bins exist 002 003 etc

    The unrestricted stock should go to 004 and then if no bins exist 005 006 etc

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Frenchy

      The issiue is that all the product from producion run is under quarantine until QI realased it. But for additional laboratory tests we need to separete first 3 palets form a producion.

      When I will do putaway startegy based on porudcion order number how i can skip puting away those 3 palets to another place then system determinate according to selected bins in put away startegy.

      Even if i could phisicly put them in another place( and change status for bloc stock manualy) i will have discrapences in bin capacity, becouse i wolud have to confirm puting them away in palces witch has been selected during put away startegy.

      Is it more clear now?

      I'm before implementaion of SAP and I haven't done it yet in real enviroment.

  • author's profile photo Former Member
    Former Member
    Posted on Oct 13, 2010 at 04:01 PM

    I am not sure how you achieve this without using SAP QM and even then I am not sure if that would work.

    You could simply cancel the first three lines of the Transfer order which will leave the stock in the Interim St Type fpr Production which is either 901 or 914 and then create a TO manually for these three pallets using a specific movement type you have created to send them to a specific area

    You can create a movement type specific put away strategy and so when you use that movement type they will go to the specific st type and bins you create

    I hope that this helps

    Frenchy

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.