on 12-06-2016 1:47 PM
Hi all,
I am on SAP PO 7.5. It's a dual stack and I am trying to implement, C4C implementation. Which is better for C4C , single stack or dual stack installation?
We have done single stack configurations like ICO, IDOC_AAE adapter. It's not working and also we have a technical system created in the SAP PO as ABAP system.
Is it possible now to create a single stack SAP PO technical system and business system without deleting or changing the existing dual stack technical systems and bsuiness systems for PO?
Harish
Are these custom interfaces between ECC and C4C or you are using standard SAP content?
PO 7.5 supports only dual usage and not dual-stack like in the previous versions. So you are already SAP PO single stack in a way. It is just a matter of getting your NWA Destinations to work with right details and maintaining SM59 in ECC.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
81 | |
24 | |
11 | |
9 | |
7 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.