Skip to Content

PO 7.5 Dual stack and single stack installation

Hi all,

I am on SAP PO 7.5. It's a dual stack and I am trying to implement, C4C implementation. Which is better for C4C , single stack or dual stack installation?

We have done single stack configurations like ICO, IDOC_AAE adapter. It's not working and also we have a technical system created in the SAP PO as ABAP system.

Is it possible now to create a single stack SAP PO technical system and business system without deleting or changing the existing dual stack technical systems and bsuiness systems for PO?

Harish

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Dec 07, 2016 at 12:23 AM

    Are these custom interfaces between ECC and C4C or you are using standard SAP content?

    PO 7.5 supports only dual usage and not dual-stack like in the previous versions. So you are already SAP PO single stack in a way. It is just a matter of getting your NWA Destinations to work with right details and maintaining SM59 in ECC.

    Add comment
    10|10000 characters needed characters exceeded