Skip to Content

Mass change Work Center

Hi,

I have to change the activity type i.e. set up, machine, labor times in different operations of all materials with another different time in single click, for that I tried the Mass change Work Center, but the problem is each time I have to put the desired another time for the operations when doing the mass processing.

Is there anyway to handle this?

Please advise.

Thanks,

Hrishi

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Oct 11, 2010 at 11:55 AM

    Dear Harish ,

    There is no sap standard txn to carry out mass change work centers , you need to develop LSMW

    You can try with CA85N

    Regards

    JH

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.