on 10-11-2010 10:00 AM
Hi,
We are using CTM mfor Production Planning, inspection time is defined for the product in ECC.
The code for product before and after inspection activity is same, and no seperate operation is defined for product.
In ECC we are using standard process in QM for inspection. The issue is I want to capture the inspection time in planning while creating the planned order.
I can use GR processing time for that, but is this the only option or can anyone suggest an alternate method to model inspection time in APO.
Thanks & Regards,
Sanjog Mishrikotkar
Hi,
For basic scheduling of Planned Orders:
the time taken are 1. GR Proc time, inhouse prodn time and opening period defined in the schedule margin key.
For lead time scheduling of planned orders
the time taken are 1. Float after production, times from routing, float before production.
So i think you can map your inspection time with above timings.
Thanks,
nandha
Thanks,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.