Skip to Content

packing proposal & packing instruction

Hi Guru's,

what is difference between packing proposal & packing instruction? Is it necessary to mention packing instruction in packing proposal? can we create nested HU in packing instuction ? If yes, could u pls. elaborate step on this .

Is it necessary to define packing procedure(access sequence) for packing proposal?

how can I link this procedure for packaging materail & material to be pack?

Pls. proved step on above query.

regds

neeraj

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 13, 2010 at 06:22 AM

    You can get some information on packing proposal and instruction here:

    http://help.sap.com/saphelp_erp60_sp/helpdata/en/2d/584bbaa70f11d2b44e006094b9b9dd/frameset.htm

    (packing instructions)

    http://help.sap.com/saphelp_erp60_sp/helpdata/en/16/4bad4ea63611d2b44e006094b9b9dd/frameset.htm

    (packing proposal)

    The proposal can be made even without the instructions. But it does help automate the process.

    The packing proposal can be made manually when processing a handling unit. If an instruction is maintained, the proposal gets created automatically.

    You can create a packing proposal using TCode POP1.

    Subordinate packing instructions can be used to create instructions for nested packing elements.

    Please go through the documentation, you will get a clearer idea.

    Regards,

    Aroop

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Aroop,

      Thanks for your reply. I understood this thing properly. But I am facing problem while creating packing proposal manually.

      I dont know where I am going wrong. System showing message "Material not found amongst the materials to be packed

      Message no. VHUPD010"

      Everything is maintained in spro even I am able create HU using(Pack mat & Pack HU tab) also packing using packing instruction (POP1 & POF1)in delivery. but cant able to create HU proposal manually & automatically.

      Packaging hierarchy is creating properly using item categoy A,B but when enter material (ROH) its showing above message.

      Both material available in SLoc, maintained for Sale,SLoc,plant,WH ,HU management setting is ok,

      Both mat having same pack. material group., but different item category group.

      Now, where I am goign wrong.

      regds

      neeraj

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.