Order Data

HI Experts,

I have One material Called X #1 from one DC1 and the same Material called X#2 in DC2.Here DC1 procures parts from DC2.When DC1 creates STO (PO) for DC2.How APO system would recognise the same part in DC2. WHat is the process?.

Regards,

Madhu

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Oct 11, 2010 at 05:58 AM

    Hi,

    It is highly desirable that at least in APO system, you should have one product no. across all locations in one supply chain model.

    On Execution side (ERP system, SAP or some other). it will be expeceted to have one material number across all plantrs, DCs, if all these in one ERP system. However, it is possible to have different product nos. in different systems and when we transfer data from these ERP to APO with the help of CIF user exits we can model the scenario.

    Similarly when we transfer data from APO to ERP systems, we can model the appropriate material mapping with the help of CIF outgoing user exits.

    Regards

    Datta

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 11, 2010 at 02:33 PM

    Hi Experts,

    I foegt to add some details. One DC belongs to one location code, and othr Dc belongs to different Locaction code. So here PO'e will create between two different location codes , with in supply cahin model.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 12, 2010 at 07:55 AM

    Hi Madhu

    If the 2 materials are exact replicas of each other, then you can use the concept of super cession or FFF (in case you have many products). What the system will do is that it will look for stock of the alternate product (X#2) at DC1 before planning for the stock of X#1 at DC1. I hope you are looking at optimizing inventory for the materials. if that is the case, then super cession can be used effectively to manage this situation.

    I hope this helps.

    Let me know if you need more details on this approach.

    Else if you are foreacsting on these 2 products, then you can use location split to transfer all the demand from one product to another. You can explore that as well depending upon what exactly you are looking for.

    Rgds, Sandeep

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.