Hi all,
I want to lock all movements (CO-FI-MM) for a WBE with a Cost Element. How to do this? It's possible with a GGB0 validation?
I'm thinking about put the Cost Element code in a WBE master data field (I don't know which one yet). Then create a validation that check in Co tables that all costs movements (not budgeting) for a WBE element has the correct cost element.
How to do this?
Thanks a lot. Regards
Hi
It is possible with CO validation in GGB0 where in you can give the cost element set for which there will not be any authorization for user to post. Check with CO consultant.
It's possible with a GGB0 validation?
It can be possible with CO validation.
Cost Element code in a WBE master data field (I don't know which one yet).
You cannot assign cost element in WBSE master data. What you should do is? If the CO document contains is posted with that cost element then check If WBSE is entered as the CO object.
For example, I want to use the PRPS-USR00 field to insert the Cost Element code and create a validation that all the FI documents with that WBS element must have the Cost Element contained in the PRPS-USR00 field of that WBS.
Can anybody help me?