Dear:

I am working for a telecom company using BO-PCM for ABC costing. In this company, they need to assign the asset costing to multiple layers of units. What I want ot know is how to define the cost object and resource driver to meet their requirement. Thanks

Best Regards

Gu Zheng

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 13, 2010 at 05:09 PM

    Dear Gu Zheng,

    Could you expand on what you mean by multiple layers of units? If you mean making multiple levels of allocations, you can do that in PCM through the re-assignments function and/or the cascade of cost object dimensions. However, the number of reassignments and cost object member cascades can negatively impact model performance. At PCS Consulting, we try to minimize and many times eliminate the need for reassignments through alternative designs to accomplish the clients needs.

    Feel free to contact me at mstevens at pcsconsulting.com or 317-815-8680 for more information.

    Best Regards,

    Mark Stevens

    PCS Consulting, Inc.

    www.pcsconsulting.com

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.