Skip to Content
author's profile photo Former Member
Former Member

HOW OUTPUT IS PROPOSED FROM SYSTEM AUTOMATICALLY ?

Dear all,

Please tell me whether i am right or wrong 'system propose output for a document' ;

1) From output determination procedure assing to that document type OR customer master record.

Also i don't understand how output determination is linked to customer master record from partner function or anything else ?

MANU TALWAR

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2010 at 10:43 AM

    Hi Manu,

    1. Iif We go to Sales document type, We can see Output application Is V1 For sales V2 For Delivery and V3 for Biling. It detrmines the which output types it has to propose and Each output type has a partner function for varoius medium for communicatiion for a Output type.

    2. We also have to configure Output procedure for Output type to Propose automatically for order, delivery or Billing.

    3. It is not based on the customer master. Since partner function determined as per the partner determination. and each partner function is assigned to an account group.

    hope this answer your doubt.

    Thanks

    Shekar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2010 at 10:58 AM

    hi Manu

    Also i don't understand how output determination is linked to customer master record from partner function or anything else ?

    Output determination is not lined to Custiomer master record

    But yes, if you go to NACE and select any Application and output type, and click on partner functions, you will be able to see for medium some partner function is assgined, which means while using that output type for specific medium, that pertern function should be selected while output determination

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2010 at 11:14 AM

    Hi,

    In Addition,

    Under NACE txn. Conditon Records... Here you will define.. for what combination..when the output has to triger.. This wil control the output to print immedieately or send to spool, or delete the output immedieately.....

    Regards

    GK.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2010 at 02:07 PM

    Dear all,

    first i thanks to all for ur replies.

    my first question is solved "system propose output automaticallyfrom condition tecnique or we can say output determination procedure assing to that document type at header or item level".But

    If output is not linked to customer master then why we maintain output type & language in customer master.

    MANU TALWAR

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.