Skip to Content

Mass Update of Cross-Plant Configurable Material

Hello everyone,

If no configurable item has been assigned to some materials (in other terms, the field MARA-SATNR is empty in the basic data view of their material master), is there a way to assign a configurable item in mass to all these materials?

ex.: Item 1- Item 2 - ... - Item N

We want to assign the same configurable material "X" to these N items.

The reason I am asking is that the field MARA-SATNR is not available in the MASS transaction for the object type "BUS1001" (Materials - industry) that we are using. So it seems that we would need to create either an LSMW project or a CATT.

Thanks,

Annabelle R.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Oct 12, 2010 at 07:30 PM

    There has been no response yet. So I guess that I need to create either a CATT or an LSMW.

    Any other thoughts? Thanks.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.