Hello,
when i created a sales order(VA01) the sistem propose the same arrival
time in the line of the material and in the BOM material. But when i
push the "check item availability" button the arrival time is diffent
by one second each other. This produced that if change quantity or the
arrival time in the material line, the BOM material doesn´t take the
same quantity or arrival time.
Thanks,
Best Regards.