Skip to Content
0
Former Member
Sep 29, 2010 at 09:47 AM

Crystall Reports installation on install shield

14 Views

I am deploying a project developed on vs2010 and crystall reports 2008. When i install the program to a client, using visual studio installer all i have to do is run a CRRuntime_12_2_mlb file and everything works fine. However if i use the install shield to deploy the program, it fails to run my reports. i have also tried to run the CRRuntime_12_2_mlb file but still it wont. maybe i am missing a step on install shield can someone help me out?