PO Output type determination

Hi All,

We have a release strategy setup in the ECC for the POs. The output type is determined and is triggerred only when the PO is released. We have a requirement routine attached to the procedure. While creating a PO and changing it before the release, this requirement routine gets triggered. But once the PO is released and changed, this routine does not get triggered. Could anyone please suggest, what might be the reason to this.

Thanks in advace!

Best Wishes,

Smita

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 29, 2010 at 03:36 PM

    Hi,

    Please check the configuration for PO release procedure. In the release Indicator for purchase order under chagble select

    6 Changeable, new release if new strat. or value change/ outputted.

    Regards

    Mohan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 04, 2011 at 12:21 PM

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.