How to change time that history cleanup runs

We're on DS 14.2.11.

We've recently changed our repository server from MS SQL Server to MySQL. Every morning at 6 am, the job to clean up history from the repositories runs and puts exclusive locks on the history and stats tables. This is preventing our normally running jobs from running until it is done, which can take anywhere from 10 to 30 minutes or so.

Does any one know if there's a way to reschedule that history cleanup job? I'd really like to get it to run around 2 am or so, when we don't have jobs running.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Mar 04, 2019 at 04:20 PM

    If the History clean up job is a scheduled batch job, it will need to be disabled and rescheduled to run at a different time through the Data Services Management Console Scheduling tab.
    If not, how was the clean up process configured? What is the retention period set to?

    Data Services Administrator Guide section: History retention and Job Server log retention

    https://help.sap.com/viewer/e54136ab6a4a43e6a370265bf0a2d744/latest/en-US/07196844760845dcabcc89c4cb7db2b3.html

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.