cancel
Showing results for 
Search instead for 
Did you mean: 

ECM usage in BOM

Former Member
0 Kudos

Dear all,

I am using ECM for BOM change.I am creating change number through CC01 and also maintaining the material code in Object type

material BOM with plant and usage.But when I am changing BOM with refrence to change number syatem is asking me valid from date . After entring valid from date also system is not allowing me to enter in to BOM for changes.Already I have maintained valid from date for change in CC01.Also I am using ECR without release key.Further the system status is created which is not editable.

When I am comparing same BOM with two different change numbers in CS14 system is throwing error BOM not processed with Engineerin change .

My requirement is I am creating Engg BOM with usage 2. After some days I have to do changes with amendment number, I should do with refrence to change number only .I need to compare original BOM with changed BOM in CS14.Secondly I am copining same item components partially for production BOM with usage 1.Change should reflect in production BOM also.

Regards,

manoj

Accepted Solutions (1)

Accepted Solutions (1)

former_member196530
Active Contributor
0 Kudos

Dear

You have to consider the revesion level option through CC11,CC12 for BOM header item refernce to Change Number .Now based on this revesion level , you can compare the change histroy against the change number .

Refer :

Regards

JH

Edited by: Jiaul Haque on Sep 27, 2010 9:45 AM

Answers (1)

Answers (1)

Anupam1143
Active Contributor
0 Kudos

HI

Check this link

Regards

Anupam Sharma