Former Member
Sep 25, 2010 at 10:38 AM

For a Production order - Operation wise Inspection Lot

324 Views

Hi Experts,

Please help me out to resolve the following problems.

1. How can we create inspection lot for each operation for a production order?

If a production order has 10 operations, I will have to have 10 inspection lots for that order.

2. I have a final assembly called A with components B & C. Some other material called D has similar characteristics of B.

But sometimes, for A, instead of B (if stock is not available), i want to use D also. Please note that, if B is not available, then

only, I will use D. Otherwise always B only, so we cannot go with probability.

How can we map this scenario? and MRP run also should consider D if B is not there.

Thanks in advance.

Regards,

Vijay.