Hi,

As per the client requirement, we have assigned the three level status profile to in inquiry process like Block status, Review and approve status.

Block status-It is initial status. After save the document it will be in block status

Review status u2013It is the 2nd status. After review of authorized person, it will be changed as review status.

Approve status- If everything is correct, then higher authority will give the approval for same and will change the status.

Here client requirement is after approval of same inquiry document, it should not allow to anybody to change anything (quantity, material, any addition) in same document with va02 Tcode. Need your support if anything possibility is there for same requirement.

Thanks

Utpal mishra

Sr.SD Consultant

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Sep 24, 2010 at 08:11 AM

    Already another thread is still open. Please maintain one thread for better monitoring.

    Thanks

    Regards,

    Reazuddin MD

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.