cancel
Showing results for 
Search instead for 
Did you mean: 

one pr for multiple materials with line items while running mrp

Former Member
0 Kudos

Hi SAP gurus,

I am config the system for MRP as per my client requerement.

We use CBP for different RAW materialsfor example they having a 10 materials for planning,were,

MRP type is VB,

LOT size is FX,with Different Reorder points and fix order quantity for all materials,

My client whant run MRP for all these materials in single time that means they whant multiple item at single levels,

i soles these requirement with the help of Product Group(sop) and its working but when we running md02 for product group all materials have planed and they give different purchase requistion numbers for all these materials but my client Wants single purchase requistion with line items for all these materials.

Pls give me the solution for that requirement.

thanks and Regards,

abhi

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

this is not the way SAPs MRP run works.

Where is the benefit for this?

the requisitions are not even split into header and item table, it is just one table EBAN, and either way you would get exact the same number of records in EBAN.