Skip to Content
avatar image
Former Member

How do we add new MRP controller for a material in material master

It was defined in MM02? I tried mm01 which says material has already been maintained?

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Sep 21, 2010 at 07:46 PM

    Siddu,

    If you have already created the MRP views for the material, then you must use change mode (MM02). You can overstrike the existing MRP controller and then save the changed record.

    If the 'new' MRP controller does not yet exist at all in that plant, then you must first create the MRP controller in Configuration. OMD0.

    Regards,

    DB49

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 22, 2010 at 02:51 AM

    Dear Siddu,

    If the requirement is to change the MRP controller then directly do it in MM02

    If you want to create new MRP controller then create it in OMD0 and then assign it in MM02

    Regards

    Madhu

    Add comment
    10|10000 characters needed characters exceeded