on 09-21-2010 3:27 PM
Hello All,
I have a requirement from different sources on the same day 01.10.2010, but due to rescheduling date proposed to expedite , the PR generated is split n i get 4 PR with the same delivery date but different rescheduling date. Is there any possibility to club these PR into one? or Can we have a sum qty when a PO is raised (single line n not multiple lines) as the delivery date and the vendor are the same. We do not want to use the lot size concept.
Regards
Divya
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Create 4 different line items in PO with reference to your 4 PR.
And maintain different delivery schedule in delivery schedule tab of PO. It solves your problem, I guess.
If something else is required. Get back.
Thank you!
Dipak
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.