Hi all,
I have an Inspection Plan with 4 Operations.
In only one of these operations I would like to have Inspection Points. Normally, all operations have inspection points.
Does anybody know if this is possible?
Regards,
Martin
Hii,
Inspection Points is assigned to the Inspection plan at the Header level, so you cannot allocate or omit Inspection point for one Operation or include Inspection points for other operation. It means one Inspection point for one Inspection plan.
If u want to record multiple Results recording, check with Sample drawing Procedure concepts. check and revert back.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ok,
there is obviously no way to have only one operation with inspection points.
Thanks for your answers,
Martin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Though inspection point is defined at header level, if you want to record the multiple results for only 1 operation, it is possible.For other operations, do result recording only once.What's the problem?
Vishal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.