Hi

I have transported a good number of process chains to test. However the infopackages are not visible in out test system. I looked in table RSLDPIO using options 'Active' and logical system 'testERP111' and they wern't there.

However, when i try the selection 'Active' and 'devERP111' they are there.

SO this means that the logical system name conversion hasn't worked. EVen though we have have the conversion devERP111 > testERP111 set up in the conversion of logical system names.

We have many clients (111, 112 113) on our system so the conversion is something wheich is always checked as part of transporting.

Any ideas why and how to solve it??

Accepted Solutions (1)

Accepted Solutions (1)

mr_v
Active Contributor
0 Kudos

Along with that process chains, U should also transport infopackages / DTPs existing in that process chains.

In test system, u can check table RSPAKPOS for the infopackages. If the infopackage is does not exist in that table, u should transport the same to test system.