on 09-21-2010 6:20 AM
Dear all
I use CO58 for production posting. Yield [confirmation quantity] is entered first; & when i go for "Goods Movement" system proposes raw material quantity on basis of yield entered.
I have following requirement as per my business scenario.
While posting, raw material quantity should not be proposed though yield is entered. And this is to be applied to a particular material category.
Please help.
Edited by: Chitpaavan on Sep 21, 2010 7:21 AM
If U maintained the back flush setting in master data, then,
Remove the backflush Indiactor for the material ,in MMo2, Mrp 2 view , or in Work center CRO2, or in CA02
IF U maintained in Customizing,
In opK4 remove the tick in All goods movents in General valid setting
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear ,
I think you are in PP-PI process and you want to post the confirmation through matintain PI sheet entry in CO58.After entering the PI sheet in co58 , it has screen for confirmation posting .
But yeild qty filed which gets updated based on the Confirmation parametrs set up in OPK4 for process order type and the SAP txn is CORK not CO58 .
So if you do not want to update the Backflashed compoenet qty , then Un-checked Good Movement -All Compoenets in General Valid settings in confirmation parameters -OPK4
Or elese try User eixt for confirmation posting with your requirement :
Hope this is clear
regards
JH