Hi,
I have a scenario where "branch" storage locations are to place stock transfer orders to a central storage location through MRP by using re-order point.
If the parts are not available or can not cover the requirements in the central storage location a P.req for external procurement is to be created.
So the scenario is simplified by:
Central SL: Has stock of 30each of material A
Branch SL: Has a re-orderpoint of 10 with a lot size of 5.
In the branch sl the level falls below 10 a p.req typ UB is to be created with a quantity of five for Central SL which has 30 in stock when I run say MD03. Is this possible to setup?
thanks in advance,
Maziyar