Skip to Content
avatar image
Former Member

Routing/work center selection in CU50

Hi,

In variant configuration I want to select correct routing and in another case correct operation (i.e. work center) in CU50 screen.

In case of correct routing selection, I have created different groups of routing (for the same material) and classified them at the header level based on the characteristics I have for the header material. In each routing group I have given the proper value of the characteristics in its classification screen.

However in CU50 when I click on the task list button, system shows me all the groups whereas I want to have the unique routing which corresponds to the characteristics value I have given as Input.

In case of correct operation/work center selection, I am bit confused whether to classify the workcenters or to classify the operations (at operation level) in the routing. Again to make one operation variant I guess I need to enter all the variant operations with the same operation number (e.g. 0010 or 0020 etc.), for which system would give error message. In such cases how it is to be done?

Request your suggestion.

Thanks in advance!

Snigdho.

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

1 Answer

  • Best Answer
    Sep 20, 2010 at 05:53 PM

    Hi snigdho,

    I think your requirement is to select the Correct Routing and also correct Operation based on the paramters given inthe Configuration.

    For this to happen, ensure that the selection condition is writtern properly for the Operation,

    Once your have your SElection conditions dependencies attached to the operation then based on the configuraiton the operation will be selected correctly

    Reg

    Dsk

    Add comment
    10|10000 characters needed characters exceeded